Three Bottling Lines Started Up in Kazakhstan

Views: 626 Author: Howie SUN Publish Time:
Kazakhstan took delivery of a 000 BPH line built around a filler. The scope, the non-standard items and the delivery sequence are set out below.

helps customer to launch 3 lines succesfully in Kazakhstan

Project at a glance
DestinationKazakhstan
Capacity000 BPH
Configurationwater treatment
Productfilling equipment
ScopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Shortly after the 2026 Spring Festival, the Sunswell team immediately set off for Shymkent, Kazakhstan, to install and commission three production lines for client, Baymen Food. The project covers three complete beverage production lines, including a set of 30 tons / hour RO water treatment equipment, a set of 5 tons / hour tea beverage and carbonated soft drink preparation system, one 8 000 BPH(1L) PET bottle Water Filling Line, one 1200BPH(5L) Water Bottling Line and one 6000 CPH ( 450ml) Canning Line for tea and carbonated soft drink.

What was non-standard about the project?

The Sunswell installation team quickly entered the working state after arriving at the destination. From tool preparation, parts inventory to equipment in place. The professional service of Sunswell team is well received by the customer, and the installation work is advancing very fast. After two months of hard work, the installation and commissioning of the three production lines were successfully completed.

StationFunction in the line
Water treatmentIn scope

The specification sheet for the Isobaric Filling Machine for CSD and Sparkling Water carries the utility figures quoted here.

Frequently asked questions

What does the order cover?

The order covers Supply, factory test, shipping, commissioning, configured with water treatment. The line was specified for filling equipment.

What capacity was specified, and what should the plant plan on?

000 BPH at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for filling equipment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Kazakhstan took delivery of a line rated 000 BPH, configured for filling equipment.
  2. Scope ran from factory test to commissioning: Supply, factory test, shipping, commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.