Tray Packer: When a Tray Beats a Full Shrink Wrap

Views: 3762 Author: Howie SUN Publish Time: Update Time:
Support equipment removes a manual task or a defect source; it does not raise the filler rating, and its value is measured in rejects and consumables.

1

Project at a glance
DestinationGermany
Rated outputSet by the order
Configurationpacker, shrink
Productline equipment
ScopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Tray Packer suit for beverage, drinking water, beer wine and infusion bottle ect. packaging, which can be packed without tray and with a firm and beautiful appearance.

What was non-standard about the project?

Serve control technology can maintain the mechanism of precise synchronization of advanced, reliable delivery.

StationFunction in the line
PackingSecondary packaging

Reference unit for this duty: the Aluminum Can Filling Machine for Beer, Carbonated Soft Drink.

What does the delivery record show?

The heating box, reasonable structure, heat insulation, high precision of temperature control. Supporting German Siemens, Germany P+F, Japan SMC, Italy motorcycle Rio, the world's most advanced control System components, equipment, stable operation. Mechanical transmission components using after heat treatment of stainless steel or carbon steel and other materials; spraying the surface quality, The antirust performance.

Site requirements, air and power consumption sit with the Aluminum Can Filling Machine for Hotfill Juice and Tea.

Frequently asked questions

What does the order cover?

The order covers Supply, factory test, shipping, commissioning, configured with packer, shrink. The line was specified for line equipment.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for line equipment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Germany took delivery of a line rated Set by the order, configured for line equipment.
  2. Scope ran from factory test to commissioning: Supply, factory test, shipping, commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.