| Application | Still water, RO water, mineral water |
| Filling principle | Gravity or volumetric valve |
| Capacity range | 5,000-48,000 BPH at 500 ml |
| Bottle range | 200 ml to 16 L, by configuration |
| Contact material | SUS 304 product contact, CIP-ready |
| Line scope | Treatment, blowing, filling, capping, labelling, packing |
A water line stands or falls on three inputs: raw water analysis, neck finish, and how well filler and capper are matched. Most of the meeting goes on BPH; the other two get a fraction of the time. Rinser clamps and capping heads are cut for one neck finish; a 1 mm thread change means new change parts rather than a new machine.
The heart of the line is a washing filling capping monobloc with 10 washing stations: alkaline washing, drip-off, reclaimed water rinsing (two stations), disinfectant rinsing (two stations), drip-off, purified water rinsing (two stations), and final drip-off.
Work backwards from cases per day. Divide bottles per day by productive hours, then divide again by a production factor of 0.65-0.85. The factor covers changeover, CIP, label roll changes and downstream stops. Sizing at 1.0 is the most common and most expensive mistake in a water project, because the shortfall only appears once the line is running.
Rated at 1800 barrels per hour based on the standard 18.9L format, the line covers the entire process from empty barrel decapping, external brushing, barrel feeding, washing/filling/capping, to light inspection and shrink wrapping.
| Filling principle | Best for | Watch out for |
|---|---|---|
| Gravity | Still water, one rigid bottle size | Thin-wall bottles deform under head pressure |
| Volumetric valve | 3-15 L and mixed formats | Valve wear shows as slow drift, not a sudden error |
| Isobaric | Carbonated water only | Needs counter-pressure, so slower per valve |
| Load cell | Oil and high-value liquid | Slower cycle, higher cost per valve |
Rated output, change parts and services are listed on the Blow-fill-cap Combibloc for Still Water page.
Star wheels, guide rails, grippers, cap chute and filling recipe all change with the format. The parts are not the cost; the time is. Two formats on one line typically cost 40-90 minutes per switch, which is why the production factor falls from about 0.85 to 0.70 and why a second small line is sometimes cheaper than one flexible line.
Where this becomes a line rather than a single machine, the Gravity Filling Machine for Still Water is the starting point.
Mineral water is defined by its source and its mineral profile, so treatment is limited to what the label claim allows. Purified water starts from any feed and is built up to a specification. The filling machine is the same; the treatment train and the legal claim are not.
The same question is worked through from another angle in How to Design an Efficient Water Filling Line Layout.
Gravity holds a fill level, so accuracy depends on bottle geometry. Because volumetric filling doses by chamber volume, accuracy holds across bottle sizes. For one rigid bottle size, gravity is enough; for 3-10 L or mixed formats, volumetric is safer.
For a complete line with blowing, filling, labelling and packing, plan several weeks on site after arrival, plus operator training. Civil work and utility readiness are the usual delay, not the machinery.
Not on the same filler. Carbonation needs isobaric valves, a CO2 dosing and mixing unit, and a different bowl. A combiblock can carry both valve sets, but they are separate specifications, not a field conversion.
Commercial practice is a stated band per bottle size, typically checked by weight at the filler outlet. The band belongs in the acceptance protocol. A line without a written tolerance will argue about it at commissioning.



Country: Maldives
Product: PET Bottled Mineralized Water
Capacity: 24,000BPH (500ml); 2 Lines
Solution:Water Production Line
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)