| Application | Still water, RO water, mineral water |
| Filling system | Gravity or volumetric valve |
| Capacity range | 5,000-48,000 BPH at 500 ml |
| Bottle sizes | 200 ml to 16 L, by configuration |
| Wetted parts | SUS 304 product contact, CIP-ready |
| Line scope | Treatment, blowing, filling, capping, labelling, packing |
Raw water, neck finish and the filler-capper match decide more about a water line than its BPH. Most of the meeting goes on BPH; the other two get a fraction of the time. Change the thread by a millimetre and the rinser clamp and capping head have to change with it.
Work backwards from cases per day. Divide bottles per day by productive hours, then divide again by a production factor of 0.65-0.85. The factor covers changeover, CIP, label roll changes and downstream stops. Sizing at 1.0 is the most common and most expensive mistake in a water project, because the shortfall only appears once the line is running.
| Filling principle | Best for | Watch out for |
|---|---|---|
| Gravity | Still water, one rigid bottle size | Thin-wall bottles deform under head pressure |
| Volumetric valve | 3-15 L and mixed formats | Valve wear shows as slow drift, not a sudden error |
| Isobaric | Carbonated water only | Needs counter-pressure, so slower per valve |
| Load cell | Oil and high-value liquid | Slower cycle, higher cost per valve |
Throughput and change-part lists are on the Blow-fill-cap Combibloc for Still Water page rather than in this note.
Star wheels, guide rails, grippers, cap chute and filling recipe all change with the format. The parts are not the cost; the time is. Two formats on one line typically cost 40-90 minutes per switch, which is why the production factor falls from about 0.85 to 0.70 and why a second small line is sometimes cheaper than one flexible line.
The specification sheet for the Gravity Filling Machine for Still Water carries the utility figures quoted here.
Ask for the rated capacity of the slowest station, the changeover checklist, the CIP cycle time, and the water and power consumption per 1,000 bottles. Those four numbers decide the real cost per bottle. A quotation that lists only the filler capacity and a total price leaves the buyer comparing incomparable offers.
The same question is worked through from another angle in A Guide to Common Materials Used in Water Filling.
Temperature, valve wear and bottle variation, in that order. Water is less sensitive than oil, but a warm product foams more and a worn valve closes late. Weighing a sample every few hours catches the drift before it reaches the customer.
200 bottles per minute. Divide BPH by 60. A 24,000 BPH line runs at 400 bottles per minute, which is why filler and packer have to be matched rather than bought separately.
Yes, with change parts: star wheels, guide rails, grippers and a filling recipe. Budget 40-90 minutes per switch and expect the production factor to drop from about 0.85 to 0.70.
Plan for 380 V three-phase power, 0.6-0.8 MPa compressed air, and a chiller if blow molding runs in-house. Exact consumption belongs in the utility schedule of the quotation, not in a rule of thumb.
For a complete line with blowing, filling, labelling and packing, plan several weeks on site after arrival, plus operator training. Civil work and utility readiness are the usual delay, not the machinery.
Commercial practice is a stated band per bottle size, typically checked by weight at the filler outlet. The band belongs in the acceptance protocol. A line without a written tolerance will argue about it at commissioning.
Country: Maldives
Product: PET Bottled Mineralized Water
Capacity: 24,000BPH (500ml); 2 Lines
Solution:Water Production Line
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)