Water Treatment for Bottling: What the Raw Analysis Decides

Views: 4427 Author: Howie SUN Publish Time: Update Time:
A filler that outruns its RO looks like a filling problem and is a treatment problem, which is why the buffer tank belongs in the line sizing.

2

Project at a glance
DestinationExport project
Rated outputSet by the order
Configurationwater treatment
Productwater treatment
Supply scopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Treatment for drinking water production involves the removal of contaminants and/or inactivation of any potentially harmful microbes from raw water to produce water that is pure enough for human consumption without any short term or long term risk of any adverse health effect. In general terms, the greatest microbial risks are associated with ingestion of water that is contaminated with human or animal (including bird) faeces. Faeces can be a source of pathogenic bacteria, viruses, protozoa and helminths. The removal or destruction of microbial pathogens is essential, and commonly involves the use of reactive chemical agents such as suspended solids to remove bacteria, algae, viruses, fungi, and minerals including iron and manganese.

What was non-standard about the project?

Raw water tank→ Raw water pump →Multi-media filter → Carbon filter → Precision filter(5u).

StationFunction in the line
PackingSecondary packaging

Rated output, change parts and services are listed on the Aluminum Can Filling Machine for Beer, Carbonated Soft Drink page.

What does the delivery record show?

Sunswell, a professional manufacturer of beverage packaging equipments. Keep the original intention, continue to develop and progress, to create value for clients.

The unit behind this configuration is the Aluminum Can Filling Machine for Hotfill Juice and Tea.

Frequently asked questions

What does the order cover?

The order covers supply, factory test, shipping and commissioning, configured with water treatment. The line was specified for water treatment.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for water treatment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated Set by the order, configured for water treatment.
  2. Scope ran from factory test to commissioning: supply, factory test, shipping and commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.