| Non-carbonated, 0.2–2 L | 12,000–48,000 BPH |
| Non-carbonated, 3–7 L | 3,000–12,000 BPH |
| Non-carbonated, 7–16 L | 2,000–6,000 BPH |
| Bottle range | 200 ml to 16 L, by configuration |
| Filling system | Gravity or volumetric valve, SUS 304, CIP-ready |
| Control platform | Siemens PLC and touch screen, SEW main drive |
Six stations sit in series, and each one can throttle the line. The filling monoblock gets the attention; the treatment skid and the packer are usually what decide whether you hit the number.
| Station | What it does | How it limits your output |
|---|---|---|
| Water treatment | Sand and carbon filtration, softening, RO, UV or ozone | RO recovery and storage buffer size set the ceiling. A line that fills faster than the RO can feed it will starve at shift start. |
| Blow molding | Heats PET preforms, stretches and blows into the mold | Mold changeover time decides how many bottle formats you can run in one week, not one shift. |
| Rinser-filler-capper | Rinses the empty bottle, fills, applies and torques the cap | Filling valve count and cap torque consistency set the rated BPH. |
| Labeler | Applies OPP, shrink sleeve or sticker labels | Label roll changes and glue temperature drift are the most common unplanned stops. |
| Packer | Shrink wrap, carton or tray | Film tension and seal temperature need re-setting for every format change. |
| Palletizer | Stacks cases or shrink packs onto pallets | Pattern change is manual on semi-automatic units and eats 20–40 minutes per switch. |
The practical consequence: a 24,000 BPH filler paired with a packer rated at 18,000 BPH is an 18,000 BPH line. When you compare quotations, compare the lowest rated station, not the filler alone.
Start from cases per day, not from a number a supplier suggests. Work backwards through the chain and apply a production factor for changeover, CIP and downstream stops. If you would rather see the arithmetic worked through on a real demand figure, the capacity calculation walkthrough takes the same formula step by step.
| Daily demand (500 ml) | Productive hours | Factor | Realistic BPH |
|---|---|---|---|
| 96,000 bottles (4,000 cases of 24) | 16 | 0.85 | 7,000 |
| 192,000 bottles | 16 | 0.85 | 14,000 |
| 288,000 bottles | 20 | 0.80 | 18,000 |
| 384,000 bottles | 20 | 0.80 | 24,000 |
A single-SKU line running one shift holds a factor near 0.85. A line with four SKUs and two changeovers per shift sits closer to 0.65. Sizing at 1.0 is the most expensive mistake in the project, because the shortfall only appears in month three, after the money is spent.
| Filling principle | Used for | Accuracy | Watch out for |
|---|---|---|---|
| Gravity | Still water, 200 ml to 2 L | Good on fixed bottle volume | Needs a stable bottle; thin-wall bottles deform under head pressure |
| Volumetric valve | Still water, 3–15 L, and format changes | Consistent across bottle sizes | Valve wear shows up as slow drift, not as a sudden error |
| Isobaric (pressure) | Carbonated water and CSD | Protects CO₂ in the bottle | Needs a counter-pressure cycle, so filling is slower per valve |
Gravity filling is the cheapest per valve and the easiest to maintain; the trade-off is that it needs a rigid bottle. The comparison of volumetric and gravimetric dosing covers the weight-based alternative when your product stops behaving like water. For a plant running 500 ml and 1.5 L on the same line, the volumetric valve filler is the usual choice: it holds fill level on both formats without changing the filling head. For a single-format 500 ml line running flat out, gravity is simpler and cheaper to maintain.
Buyers usually expect the filler to dominate the budget. It does not. Across a mid-size still water project, the split normally looks like this:
| Cost block | Typical share of budget | What moves it |
|---|---|---|
| Water treatment | 10–18% | Raw water quality, RO capacity, storage tanks |
| Blow molding | 15–25% | Whether you blow in-house or buy preforms, cavity count |
| Filling monoblock | 20–30% | Valve count, filling principle, CIP integration |
| Labeling and packing | 15–22% | Label type, shrink vs carton, automation level |
| Conveyors and palletizing | 10–18% | Line length, layout, manual vs automatic palletizing |
| Utilities and installation | 10–15% | Compressor, chiller, steam, civil work |
Two decisions swing the total more than any negotiation: blowing in-house versus buying preforms, and semi-automatic versus automatic palletizing. Both are capacity decisions disguised as equipment choices.
Not the filler. The first-year stops cluster in four places, and all four are predictable:
Ask for the changeover checklist and the CIP time at the quotation stage. A supplier who cannot produce either has not commissioned many lines.
200 bottles per minute. Divide BPH by 60. A 24,000 BPH line is 400 bottles per minute, which is why the filler and the packer have to be matched rather than chosen separately.
It depends on whether blowing, packing and palletizing are inside the same hall. The reliable way to fix the footprint is to draw the layout at 1:100 with conveyor radii included, then confirm the turning radius of the largest format you plan to run.
Yes, with changeover parts: star wheels, guide rails, grippers and filling recipes. The cost is not the parts, it is the changeover time. Two formats on one line typically costs 40–90 minutes per switch, which is why the production factor drops from 0.85 to around 0.70.
It follows the raw water analysis, not a standard package. Surface water usually needs multi-media filtration plus RO and UV or ozone; municipal water with low hardness may need only carbon filtration and disinfection. Ask for the water analysis report before the treatment skid is specified.
For a complete line with blowing, filling, labeling and packing, plan on several weeks on site after the equipment arrives, plus operator training. The variable is civil work and utilities readiness, not the machinery itself.
Country: Maldives
Product: PET Bottled Mineralized Water
Capacity: 24,000BPH (500ml); 2 Lines
Solution:Water Production Line
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)