UzFood Exhibition in Uzbekistan

Views: 4729 Author: Howie SUN Publish Time:
Two quotations that look different usually differ in four numbers: the slowest station, the changeover time, the CIP time and the consumable cost.

UzFood Exhibition in Uzbekistan

Project at a glance
DestinationKazakhstan
Output rangeSet by the order
Configurationfilling equipment
Productfilling equipment
ScopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Uzbekistan, a landlocked country located in Central Asia, is one of the two double landlocked countries in the world. Neither itself nor its five neighboring countries.

Have access to the sea. It borders Kazakhstan to the north and northeast, Kyrgyzstan and Tajikistan to the east and southeast, Turkmenistan to the west, and Afghanistan.

At the end of March, we went to Tashkent, Uzbekistan to participate in the Uzbekistan International Food, Ingredients, Food Processing and Packaging Exhibition (UzFood).

What was non-standard about the project?

The exhibition was held from March 28th to 30th, once a year.

StationFunction in the line
PackingSecondary packaging

The Gravity Filling Machine for Still Water is the reference unit for this configuration.

What does the delivery record show?

With the advancement of the national "Belt and Road" strategy, more and more food companies are looking at the Uzbek market, and Uzbekistan (Tashkent) International.

And talk more details with us after receiving the invitation.

With professional products and 10+ years’ rich experience, Sunswell attracted many customers to visit and negotiate at the exhibition, and successfully won an order on the exhibition, which is worthy of the business trip.

Where this becomes a line rather than a single machine, the Volumetric Filling Machine for Still Water is the starting point.

Frequently asked questions

What does the order cover?

The order covers Supply, factory test, shipping, commissioning, configured with filling equipment. The line was specified for filling equipment.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for filling equipment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Kazakhstan took delivery of a line rated Set by the order, configured for filling equipment.
  2. Scope ran from factory test to commissioning: Supply, factory test, shipping, commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.