On-Site Installation and Commissioning: What to Expect in the First 30 Days

Views: 299 Author: Howie SUN Publish Time: Update Time:
Filling equipment is chosen from the product and the package, and the machine follows: viscosity, acidity and carbonation pick the filling principle before BPH does.

Blow-fill-cap Combibloc for Still Water

Project at a glance
DestinationExport project
Output rangeSet by the order
Configurationconveyor, water treatment
Productfilling equipment
What is includedSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

The right technology and commercial decisions decide whether a beverage filling machine line runs compliantly, efficiently and profitably.

Installation, utility prep, FAT/SAT and commissioning must be planned before the container lands. This guide sets expectations for the critical first month of a Combiblock project.

Prepare the foundation, 3-phase power, compressed air, water and drainage. A conveyor system needs a level, clean floor and clear routes.

What was non-standard about the project?

Plan a 30-day ramp, not a 1-day start.

StationFunction in the line
Blow mouldingContainer making
ConveyorTransfer between stations

The Gravity Filling Machine for Still Water is the reference unit for this configuration.

What does the delivery record show?

If utilities and FAT are done well, yes — but a proper ramp protects OEE on the Combiblock.

Usually the party at fault; clear responsibilities in the contract avoid disputes during commissioning.

Commission your filling machine and Combiblock smoothly with Sunswell.

The specification sheet for the Volumetric Filling Machine for Still Water carries the utility figures quoted here.

Frequently asked questions

What does the order cover?

The order covers supply, factory test, shipping and commissioning, configured with conveyor, water treatment. The line was specified for filling equipment.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for filling equipment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated Set by the order, configured for filling equipment.
  2. Scope ran from factory test to commissioning: supply, factory test, shipping and commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.