| Supply scope | Filling, capping and closing equipment |
| Filling principles | Gravity, volumetric, isobaric, piston, load cell |
| Rated output | 2,000-48,000 BPH by configuration |
| Accuracy basis | Volume, weight or fill level |
| Wetted parts | SUS 304 product contact, CIP-ready |
| Key control | Fill accuracy, closure integrity, CIP time |
Filling principle comes from the product, not from the target BPH. Still liquid at a steady density runs gravity or volumetric; carbonated product needs isobaric; thick product with solids needs a piston; product sold by weight runs a load cell. A machine picked ahead of the product usually gets picked again.
A CIP cycle is measured in tens of minutes to over an hour depending on the circuit and the soil. It is not production time, and a plan that counts it as production will miss its daily output every day. The number belongs in the capacity calculation, not in the shift handover.
| Principle | Doses by | Fails when |
|---|---|---|
| Gravity | Fill level in the bottle | Bottle geometry varies |
| Volumetric | Chamber volume | Valve seal wears |
| Isobaric | Volume under counter-pressure | Pressure or temperature drifts |
| Piston | Displacement | Product carries solids |
| Load cell | Net weight | Product temperature moves |
Rated output, change parts and services are listed on the Gravity Filling Machine for Still Water page.
The neck finish sets the rinser clamp, the filling valve seal and the capping head. A change of a millimetre in the thread is a change of change parts and often of the capper. It is the single most under-specified item in a filling line enquiry.
For the same duty in another bottle format, the Volumetric Filling Machine for Still Water is specified separately.
When the formats are far apart or the cleaning regimes conflict. Two smaller fillers each run at their own rate and can be cleaned independently. One large flexible filler carries every changeover on the critical path, and its downtime is the plant downtime.
The same question is worked through from another angle in How Semi-Electric Fillers Balance Speed and Accuracy.
Yes, with change parts: star wheels, guide rails, grippers and a recipe. The parts are cheap compared with the changeover time, which is why most plants specify one dominant format.
From tens of minutes to over an hour, set by the circuit volume and the soil. It is a fixed cost per production day and should be planned as downtime, not squeezed into the shift.
Valve seals, piston seals, capping head inserts, guide rail blocks and one set of change parts for the second format. These are the items that stop a line for days when they fail.
Rated BPH is a steady-state figure at one format. Real output subtracts changeover, CIP, label changes and downstream stops, which is why planning uses a factor of 0.65-0.85.
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)