Second Injection Molding Machine Purchased by Angolan Customer

Views: 4882 Author: Howie SUN Publish Time:
Support equipment removes a manual task or a defect source; it does not raise the filler rating, and its value is measured in rejects and consumables.

1

Project at a glance
DestinationExport project
Capacity rangeSet by the order
Configurationline equipment
Productline equipment
ScopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Two years ago, Angolan customer Berosil Industrial ordered a 48-cavity injection molding machine for PET prefrom which has been installed successfully.

What was non-standard about the project?

With the successful commissioning of the first injection molding machine, the customer felt that the production capacity could no longer meet the demand. The good performance of Sunswell equipment left a deep impression on the customer. The procurement requirement for the second injection molding machine naturally passed to Sunswell, and this time they asked for a bigger and faster machine. Following this, the two parties conducted in-depth technical exchanges, and soon signed a contract for a 72-cavity injection molding machine and auxiliary equipment in early May 2023, including chiller, mold, manipulator, auto loader, and air compressor, etc.

StationFunction in the line
Line equipmentIn scope

Site requirements, air and power consumption sit with the Accessory.

What does the delivery record show?

With the confirmation of the third cooperation, the relationship between the two parties will be deeper and stronger. Sunswell will always be committed to serving old customers well.

Throughput and change-part lists are on the Conveying page rather than in this note.

Frequently asked questions

What does the order cover?

The order covers Supply, factory test, shipping, commissioning, configured with line equipment. The line was specified for line equipment.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for line equipment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated Set by the order, configured for line equipment.
  2. Scope ran from factory test to commissioning: Supply, factory test, shipping, commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.