A juice line that runs at the right temperature holds shelf life; one that runs hot enough to deform the bottle trades shelf life for rejects. Monitor dissolved oxygen (NFC oxidizes and browns; consider nitrogen dosing to displace headspace O₂).

Hotfill Type Filling Machine for Juice

Key facts at a glance
Filling principleHot-fill, up to 85 C
Capacity6,000-36,000 BPH at 0.2-2 L
PackageHeat-resistant PET geometry, or glass
LineHot-fill monobloc with tunnel pasteuriser
ProductsJuice, tea, nectar, functional drinks
Key controlFill temperature, hold time, cap seal

Why does juice get filled hot instead of cold?

Hot filling does two jobs at once: it pasteurises the product on the way to the filler, and the residual heat sanitises the bottle and cap. That is why a hot-fill line can run an acidic juice without a separate bottle steriliser. The price is a heat-resistant bottle and a longer cooling tunnel.

The CIP system must reach all surfaces with validated caustic/acid cycles and verify via conductivity or temperature logging.

How do you keep pulp and fibre moving through the line?

Pulp needs either a larger valve bore or a piston filler, and it needs continuous gentle agitation in the bowl. Dead corners in the product path settle fibre, then release it as a slug into the next bottle. Bowl geometry and return-flow design matter more than valve count here.

RouteTemperatureWhat it costs
Hot fillUp to 85 CHeat-resistant bottle and a cooling tunnel
Cold fill with preservativeAmbientFormulation constraint, not a machine constraint
Cold fill with in-line pasteuriserProduct-side onlySeparate pasteuriser and a closed filling zone
Hot fill in glassUp to 85 CGlass mass, slower line, higher transport cost

The Juice By Volumetric Filler is the matching unit when this becomes a line project.

Why does a hot-fill bottle need a cooling tunnel?

The bottle leaves the filler at up to 85 C and has to come down in a controlled ramp. A plunge cools the outside first, the inside contracts later, and the panel pulls in. The tunnel zones are set per bottle geometry and checked with a probe in the product.

Site requirements, air and water consumption sit with the Hotfill Type Filling Machine for Juice.

How is shelf life validated after a change?

With a storage trial on the actual product, bottle and closure, held at the intended temperature and sampled on a schedule. Changing the fill temperature, the bottle or the cap invalidates the previous result, which is why those three are treated as one specification.

The same question is worked through from another angle in How Volumetric Fillers Ensure Accuracy in Hotfill Juice Lines.

How to read the numbers. Capacity figures come from the specification range, and the range is wide by design. Hot-fill lines lose time to heat-up and cooling that a rated BPH does not include; plan on 0.65-0.85.

Frequently asked questions

What temperature is juice hot-filled at?

Up to 85 C, set per product and per bottle. The exact set point and tolerance belong in the product specification, because acidity, pulp content and bottle wall thickness all move it.

Does hot filling replace pasteurisation?

It replaces the bottle steriliser for acidic products, because the fill temperature and hold time do the microbial work. It does not replace correct product formulation or a validated hold tube.

Why does the bottle panel after filling?

Usually fill temperature above the bottle rating, or a vacuum that forms as the product cools. Check the fill temperature against the bottle specification and the cap seal before changing the cooling profile.

Can a hot-fill line run clear juice and pulp juice?

With a filter change and a different valve bore for the pulp, yes. Clear juice needs finer filtration, and pulp needs agitation in the bowl so the fibre does not settle.

Key takeaways
  1. Hot fill does pasteurisation and bottle sanitising in one step, and charges for it in bottle cost.
  2. A change of fill temperature invalidates the shelf-life trial.
  3. Colour loss is a temperature and hold-time decision.
  4. Cool the bottle on a ramp, not a plunge.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.