2000BPH 5-Gallon Filling Line Ready for Shipment

Views: 4280 Author: Howie SUN Publish Time: Update Time:
This note records a 2000 BPH line project built around a rinser-filler-capper monoblock. The scope and the delivery sequence are set out below.

2000BPH 5-Gallon Filling Line Ready for Shipment

Project at a glance
DestinationExport project
Capacity range2000 BPH
Configurationcapper, labeler, shrink
Productbottled water
ScopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

It is consists of de-capper, outer brusher, rinse-fill-cap 3-in-1 monoblock, light inspection, sleeve labeler and date coder.

The detail machine descriptions as below: 1.

This machine does not damage caps, it is special for 5-gallon reuse bottle.

What was non-standard about the project?

It rinses bottle through multi-working procedures, fills quantificationally and caps automatically.

StationFunction in the line
Rinser-filler-capper monoblockFilling and closing
LabellerDecoration
PackingSecondary packaging
PalletizerEnd-of-line handling

Site requirements, air and water consumption sit with the Blow-fill-cap Combibloc for Still Water.

What does the delivery record show?

All acts are controlled by computer, which achieves stable rinsing, precise filling and sealed capping.

Labeling process: bottle feeding →bottle inspection →label cutting → label sleeving →label shrinking →bottle out.

Grasping 20 bottles each time and palletizing 3 layers, with automatic interlayer sheet inserting.

Valve count, utility schedule and footprint sit on the Gravity Filling Machine for Still Water page.

Frequently asked questions

What does the order cover?

The order covers Supply, factory test, shipping, commissioning, configured with capper, labeler, shrink. The line was specified for bottled water.

What capacity was specified, and what should the plant plan on?

2000 BPH at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for bottled water.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated 2000 BPH, configured for bottled water.
  2. Scope ran from factory test to commissioning: Supply, factory test, shipping, commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.