Order for sparkling water bottling line from Turks and Caicos

Views: 4238 Author: Howie SUN Publish Time: Update Time:
Carbonated filling is a pressure and temperature problem: CO2 stays in the product only while the bottle is held above the saturation pressure for its temperature.

Order for sparkling water bottling line from Turks and Caicos

Project at a glance
DestinationTurks and Caicos
Rated outputSet by the order
Configurationrinser, filler, capper, conveyor
Productcarbonated drinks
What is includedSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

The Turks and Caicos Islands are a British Overseas Territory. They are known primarily for tourism and as an offshore financial centre.

Recently, Sunswell received an order from a customer in Turks and Caicos Isalands for purchase of sparkling water filling line in Glass bottles.

What was non-standard about the project?

The customer’s goal is to bottle sparkling water (carbonated water) liquor as vodka and in 750ml returnable glass bottles. The bottle will use pry-off crown caps. Therefore, the customer will design and make their own unique bottles. They will customize their own glass bottle mold and plastic crates mold.

StationFunction in the line
Rinser-filler-capper monoblockFilling and closing
PackingSecondary packaging
ConveyorTransfer between stations

For the same duty in another bottle format, the Isobaric Filling Machine for CSD and Sparkling Water is specified separately.

What does the delivery record show?

The whole order package includes a 3000BPH bottling line. The bottling line is mainly composed of returnable glass bottle washing machine( soaking machine, outside brusher and inside brusher), rinser/filler/capper monoblock and bottle conveyors, etc.

The CSD & Sparkling Water by Mechanical Filler is the reference unit for this configuration.

Frequently asked questions

What does the order cover?

The order covers supply, factory test, shipping and commissioning, configured with rinser, filler, capper, conveyor. The line was specified for carbonated drinks.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for carbonated drinks.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Turks and Caicos took delivery of a line rated Set by the order, configured for carbonated drinks.
  2. Scope ran from factory test to commissioning: supply, factory test, shipping and commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.