Filling equipment is chosen from the product and the package, and the machine follows: viscosity, acidity and carbonation pick the filling principle before BPH does.
Key facts at a glance
What is includedFilling, capping, labelling and packing equipment
Sizing basisDemand in units per day, divided by productive hours and a production factor
Production factor0.65-0.85 depending on formats and changeovers
Key controlFill accuracy, closure integrity, changeover time
Key decisionOne flexible line or two dedicated lines
AcceptanceOutput, accuracy, closure and changeover, measured

What is the first question to settle before choosing equipment?

Settle the product and the package before the machine. Product viscosity, acidity, carbonation and particle size decide the filling principle; the bottle neck finish decides the capping head and the change parts. A machine chosen before those two are fixed is chosen twice.

How do you compare two quotations that look different?

Compare the lowest rated station, the changeover time, the CIP time and the consumable cost per 1,000 units. A lower price with a slower packer or a longer CIP is not a lower cost. Ask both suppliers for the same four numbers in writing.

DecisionWhat it fixesWhat it does not fix
Filling principleProduct and accuracyDownstream capacity
Valve countRated BPHChangeover and CIP time
Automation levelLabour per shiftProduct quality
Line layoutFloor space and flowThroughput of the slowest station

The unit behind this configuration is the Gravity Filling Machine for Still Water.

What is the difference between capacity and throughput?

Capacity is what the machine can do at steady state in one format. Throughput is what the plant gets across a week of changeovers, cleaning and stops. Plans built on capacity alone are the reason new lines look slow in their first month.

Throughput and change-part lists are on the Volumetric Filling Machine for Still Water page rather than in this note.

Which spare parts should be bought with the machine?

One full set of valve seals, one set of capping inserts, guide rail blocks and the change parts for the second format. These are the items with long lead times that stop a line for days. Buying them with the machine is cheaper than buying them in a hurry.

The same question is worked through from another angle in The Different Types of Caps and Their Sealing Mechanisms.

How is automation level decided?

By the cost of the labour it replaces and the consistency it adds, not by the technology. A robot palletizer pays on three shifts with a stable pattern; it does not pay on one shift with five patterns. The same logic applies to inspection and packing.

How to read the numbers. Capacity figures come from the specification range, and the range is wide by design. Changeover, cleaning and downstream stops are not inside a rated BPH, so plan with a production factor of 0.65-0.85.

Frequently asked questions

How do I calculate the BPH I actually need?

Bottles per day divided by productive hours, then divided by a production factor of 0.65-0.85. The factor covers changeover, cleaning and downstream stops. Sizing at 1.0 is the most common planning error.

How long does a filling line last?

A well-maintained stainless line runs for well over a decade, with wear parts replaced on condition. The variables are water quality, cleaning regime and whether spare parts are kept in stock.

What drives the price of a filling line?

Valve count, automation level, material of construction, whether blowing is included, and the packing format. Price follows the specification, so two quotes are only comparable when the specifications match.

How do I verify a supplier before ordering?

Ask for the factory acceptance test procedure, a reference line running the same format, and the spare parts list with lead times. A supplier who cannot show a running line has not commissioned many.

How much production factor should I use for a new line?

Between 0.65 and 0.85. A single-format line on one shift sits near 0.85; a line with four formats and two changeovers per shift sits near 0.65.

Key takeaways
  1. Fix the product and the package before the machine.
  2. Compare quotations on the slowest station, changeover and CIP time.
  3. The production factor is what the plant gets, not a discount.
  4. Buy the long-lead spares with the machine.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.