3000BPH 5L PET Bottle Filling Machine to Colombia

Views: 5771 Author: Howie SUN Publish Time:
Bottled water is the simplest beverage to fill and the easiest line to oversize, because the filler rating hides the treatment ceiling, the changeover time and the packer limit. This order includes rinsing-filling-capping 3-in-1 monoblock, cap loader, cap washer and 6m bottle conveyor.

3000BPH 5L PET Bottle Filling Machine to Colombia

Key facts at a glance
Typical dutyStill water, RO water, mineral water
Filling methodGravity or volumetric valve
Capacity5,000-48,000 BPH at 500 ml
Container range200 ml to 16 L, by configuration
Contact materialSUS 304 product contact, CIP-ready
Line scopeTreatment, blowing, filling, capping, labelling, packing

What does a water line have to get right before speed matters?

Raw water, neck finish and the filler-capper match decide more about a water line than its BPH. BPH takes the meeting; the neck finish and the capper match get the last five minutes. Rinser clamps and capping heads are cut for one neck finish; a 1 mm thread change means new change parts rather than a new machine.

Gravity, volumetric or isobaric: which filling system fits?

Gravity filling holds a level in a rigid bottle and costs least per valve. Volumetric filling doses a fixed volume into a chamber, so it holds accuracy across 3 L, 5 L and 10 L formats without changing the head. Isobaric filling is for carbonated product only, because it keeps CO2 in solution under counter-pressure. A still water line never needs it.

This order includes rinsing-filling-capping 3-in-1 monoblock, cap loader, cap washer and 6m bottle conveyor.

Filling principleBest forWatch out for
GravityStill water, one rigid bottle sizeThin-wall bottles deform under head pressure
Volumetric valve3-15 L and mixed formatsValve wear shows as slow drift, not a sudden error
IsobaricCarbonated water onlyNeeds counter-pressure, so slower per valve
Load cellOil and high-value liquidSlower cycle, higher cost per valve

Throughput and change-part lists are on the Blow-fill-cap Combibloc for Still Water page rather than in this note.

How do you turn daily demand into a BPH figure?

Work backwards from cases per day. Divide bottles per day by productive hours, then divide again by a production factor of 0.65-0.85. The factor covers changeover, CIP, label roll changes and downstream stops. Sizing at 1.0 is the most common and most expensive mistake in a water project, because the shortfall only appears once the line is running.

The Gravity Filling Machine for Still Water is the matching unit when this becomes a line project.

What changes when the bottle format changes?

Star wheels, guide rails, grippers, cap chute and filling recipe all change with the format. The parts are not the cost; the time is. Two formats on one line typically cost 40-90 minutes per switch, which is why the production factor falls from about 0.85 to 0.70 and why a second small line is sometimes cheaper than one flexible line.

The same question is worked through from another angle in The Fundamentals of Pump Selection for Water Filling and.

How to read the numbers. Where a BPH appears below it is the specification range, not a measured rate. Rated BPH assumes one format and no cleaning stops. Plan on a factor of 0.65-0.85 to cover changeover, CIP and downstream jams.

Frequently asked questions

What water treatment does a bottled water line need?

It follows the raw water analysis, not a standard package. Surface water usually needs multi-media filtration, RO and UV or ozone. Low-hardness municipal water may need only carbon filtration and disinfection.

How long does installation and commissioning take?

For a complete line with blowing, filling, labelling and packing, plan several weeks on site after arrival, plus operator training. Civil work and utility readiness are the usual delay, not the machinery.

Can a still water line be converted to carbonated later?

Not on the same filler. Carbonation needs isobaric valves, a CO2 dosing and mixing unit, and a different bowl. A combiblock can carry both valve sets, but they are separate specifications, not a field conversion.

What is the acceptable fill level tolerance for water?

Commercial practice is a stated band per bottle size, typically checked by weight at the filler outlet. The band belongs in the acceptance protocol. A line without a written tolerance will argue about it at commissioning.

Key takeaways
  1. Capacity is the rating of the slowest station, not the filler nameplate.
  2. Change parts and filling system are settled by neck finish and bottle rigidity, well before BPH.
  3. It is the bottle format, not the BPH target, that picks the filling system.
  4. Five-litre and 500 ml formats are two specifications, not two settings on one machine.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.