3000BPH 200ml Glass Bottle Carbonated Filling Machine to Peru

Views: 7177 Author: Howie SUN Publish Time: Update Time:
Colombia took delivery of a 3000 BPH line built around a filler. The scope, the non-standard items and the delivery sequence are set out below.

3000BPH 200ml Glass Bottle Carbonated Filling Machine to Peru

Project at a glance
DestinationColombia
Capacity3000 BPH
Configurationconveyor
Productcarbonated drinks
What is includedSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Peru is a country in western South America, bordering Ecuador and Colombia to the north, Brazil and Bolivia to the east, Chile to the south, and the Pacific Ocean to the west.

What was non-standard about the project?

After talking with the client for around 2 month, the client placed the order very quickly, as we already supplied one similar machine to Peru last year and the client also knows that client, so he trusts us and starts the project soon.

StationFunction in the line
ConveyorTransfer between stations

The unit behind this configuration is the Filling Machine for Glass CSD.

What does the delivery record show?

The project only includes one set of 3000BPH 200ml glass bottle carbonated filling machine and 11m conveyor.

Sizing for this duty runs through the CSD & Sparkling Water by Mechanical Filler, where the valve count is set out.

Frequently asked questions

What does the order cover?

The order covers supply, factory test, shipping and commissioning, configured with conveyor. The line was specified for carbonated drinks.

What capacity was specified, and what should the plant plan on?

3000 BPH at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for carbonated drinks.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Colombia took delivery of a line rated 3000 BPH, configured for carbonated drinks.
  2. Scope ran from factory test to commissioning: supply, factory test, shipping and commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.