Filling equipment is chosen from the product and the package, and the machine follows: viscosity, acidity and carbonation pick the filling principle before BPH does. As temperatures vary, the viscosity of the liquid fluctuates, impacting the ease of movement within the bottling machinery.
Key facts at a glance
Supply scopeFilling, capping, labelling and packing equipment
Sizing basisDemand in units per day, divided by productive hours and a production factor
Production factor0.65-0.85 depending on formats and changeovers
Key controlFill accuracy, closure integrity, changeover time
Key decisionOne flexible line or two dedicated lines
AcceptanceOutput, accuracy, closure and changeover, measured

Where does a filling line lose output that the specification ignores?

Changeover, CIP, label roll changes and downstream stops. A line rated at 12,000 BPH and run with four formats and two changeovers per shift delivers closer to 8,000. The production factor is not a discount on the machine; it is what the plant actually gets.

Automated systems can adjust filling speeds, nozzle positions, and fill levels based on real-time temperature data, ensuring consistent performance throughout the production process.

What does the factory acceptance test actually prove?

It proves the machine meets the written specification on the agreed product, at the agreed format, in the builder workshop. It does not prove the line will run in your building. Both tests are needed, and the second one is where most disputes start.

DecisionWhat it fixesWhat it does not fix
Filling principleProduct and accuracyDownstream capacity
Valve countRated BPHChangeover and CIP time
Automation levelLabour per shiftProduct quality
Line layoutFloor space and flowThroughput of the slowest station

A different bottle format means a different unit; see the Gravity Filling Machine for Still Water.

Which spare parts should be bought with the machine?

One full set of valve seals, one set of capping inserts, guide rail blocks and the change parts for the second format. These are the items with long lead times that stop a line for days. Buying them with the machine is cheaper than buying them in a hurry.

To maintain filling accuracy, it is imperative for bottling plants to make necessary adjustments based on the temperature of the product being processed.

The Volumetric Filling Machine for Still Water is the reference unit for this configuration.

How is automation level decided?

By the cost of the labour it replaces and the consistency it adds, not by the technology. A robot palletizer pays on three shifts with a stable pattern; it does not pay on one shift with five patterns. The same logic applies to inspection and packing.

The same question is worked through from another angle in How to Improve Overall Equipment Effectiveness (OEE) in Bottling.

How to read the numbers. The output figures are specification ranges; the measured rate depends on the product and the shift. A rated figure assumes one format and no cleaning stops. Plan on 0.65-0.85 to cover changeover, CIP and downstream stoppages.

Frequently asked questions

How long does a filling line last?

A well-maintained stainless line runs for well over a decade, with wear parts replaced on condition. The variables are water quality, cleaning regime and whether spare parts are kept in stock.

Can a line be upgraded later?

Capacity is usually added by a second line or by a downstream upgrade, not by speeding up the filler. The filler, the capper and the packer are matched, so raising one alone moves the bottleneck.

What drives the price of a filling line?

Valve count, automation level, material of construction, whether blowing is included, and the packing format. Price follows the specification, so two quotes are only comparable when the specifications match.

How much production factor should I use for a new line?

Between 0.65 and 0.85. A single-format line on one shift sits near 0.85; a line with four formats and two changeovers per shift sits near 0.65.

Key takeaways
  1. The production factor is what the plant gets, not a discount.
  2. The factory test proves the specification, not the building.
  3. Two quotes are comparable only when the specifications match.
  4. Ask for the FAT procedure before the price.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.