| Supply scope | Filling, capping and closing equipment |
| Filling principles | Gravity, volumetric, isobaric, piston, load cell |
| Rated output | 2,000-48,000 BPH by configuration |
| Accuracy basis | Volume, weight or fill level |
| Wetted parts | SUS 304 product contact, CIP-ready |
| Key control | Fill accuracy, closure integrity, CIP time |
Rated output at the specified format, fill accuracy on a defined sample, closure torque or seal measurement, and a timed changeover with the buyer watching. Anything not measured before sign-off becomes a discussion after the final payment.
Foaming product needs a slower fill ramp and often a longer nozzle that reaches below the surface. The machine is the same frame with a different valve and a different cam or recipe. Sizing it on the water rate and hoping the foam settles is how lines end up at half output.
| Principle | Doses by | Fails when |
|---|---|---|
| Gravity | Fill level in the bottle | Bottle geometry varies |
| Volumetric | Chamber volume | Valve seal wears |
| Isobaric | Volume under counter-pressure | Pressure or temperature drifts |
| Piston | Displacement | Product carries solids |
| Load cell | Net weight | Product temperature moves |
Valve count, utility schedule and footprint sit on the Gravity Filling Machine for Still Water page.
It saves capital and floor space, and it costs labour per shift. Manual loading, manual packing and manual palletizing are the usual trades. For a small plant with a single format and a flexible crew, that is a sensible trade; for a plant running three shifts it is not.
Where this becomes a line rather than a single machine, the Volumetric Filling Machine for Still Water is the starting point.
When the formats are far apart or the cleaning regimes conflict. Two smaller fillers each run at their own rate and can be cleaned independently. One large flexible filler carries every changeover on the critical path, and its downtime is the plant downtime.
The same question is worked through from another angle in A Guide to Key International Certifications for Filling Machinery.
A single frame carrying the rinser, the filler and the capper, driven and controlled together. It removes two transfers and the floor space between three separate machines.
From tens of minutes to over an hour, set by the circuit volume and the soil. It is a fixed cost per production day and should be planned as downtime, not squeezed into the shift.
Bottle capacity variation, product temperature, valve wear or foam. On glass, mould-to-mould capacity variation alone is enough to make level filling inconsistent, which is why glass lines often check-weigh.
Valve seals, piston seals, capping head inserts, guide rail blocks and one set of change parts for the second format. These are the items that stop a line for days when they fail.
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)