Can Depalletizer Sizing: Speed, Layer Pattern and Buffer

Views: 3124 Author: Howie SUN Publish Time: Update Time:
A can line is rated in cans per hour because the seamer sets the pace, and the seam, not the filler, is where the rating is usually lost.

Aluminum Can Depalletizer From Sunswell

Project at a glance
DestinationExport project
CapacitySet by the order
Configurationconveyor, palletizer
Productaluminum can filling
What is includedSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

The lifter position control by photoelectric sensor, locate automatically. Bottles auto output from the system.

What was non-standard about the project?

Hydraulic car put the whole stack bottles into unstacking station (hydraulic lift table).

StationFunction in the line
ConveyorTransfer between stations
PalletizerEnd-of-line handling

For the same duty in another bottle format, the Aluminum Can Filling Machine for Beer, Carbonated Soft Drink is specified separately.

What does the delivery record show?

Nursing bottle cylinder starts, cover entire stack bottles from three sides.

Hydraulic lifts start, hold the board rise to a certain height crib.

Folder separator cylinder starts, Spacer clip Tightly clamp the Partition.

The Aluminum Can Filling Machine for Hotfill Juice and Tea is the reference unit for this configuration.

Frequently asked questions

What does the order cover?

The order covers supply, factory test, shipping and commissioning, configured with conveyor, palletizer. The line was specified for aluminum can filling.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for aluminum can filling.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated Set by the order, configured for aluminum can filling.
  2. Scope ran from factory test to commissioning: supply, factory test, shipping and commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.