The Importance of Water Treatment in Bottled Water Production

Views: 2772 Author: Howie SUN Publish Time:
Water treatment is specified from the raw water analysis, not from a standard package, and the RO recovery rate sets the ceiling for the whole line.
Project at a glance
DestinationExport project
Output rangeSet by the order
Configurationwater treatment
Productwater treatment
Supply scopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Water treatment is a critical step in the production of bottled water, as it involves removing contaminants and impurities to ensure the water is safe for consumption. Purification processes are essential to guarantee that bottled water meets the necessary quality standards and is free from harmful substances.

What was non-standard about the project?

One of the primary steps in water treatment for bottled water production is filtration. This process helps in reducing suspended solids, turbidity, and other contaminants present in the water. Common filtration methods used in bottled water plants include sand filtration, activated carbon filtration, and membrane filtration.

StationFunction in the line
Water treatmentIn scope

Site requirements, air and power consumption sit with the Water Treatment.

What does the delivery record show?

Call to Action (CTA) for the Sunwell Brand.

Reference unit for this duty: the Pre-treatment.

Frequently asked questions

What does the order cover?

The order covers supply, factory test, shipping and commissioning, configured with water treatment. The line was specified for water treatment.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for water treatment.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated Set by the order, configured for water treatment.
  2. Scope ran from factory test to commissioning: supply, factory test, shipping and commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.