How to Write a Request for Quote (RFQ) for a Water Filling Line

Views: 1781 Author: Howie SUN Publish Time: Update Time:
A bottle water line is treatment, blowing, filling, capping and packing in one chain, and its real output is set by the slowest station in that chain rather than by the filler nameplate.
Key facts at a glance
ApplicationStill water, RO water, mineral water
Filling systemGravity or volumetric valve
Rated output5,000-48,000 BPH at 500 ml
Bottle sizes200 ml to 16 L, by configuration
Wetted partsSUS 304 product contact, CIP-ready
Line scopeTreatment, blowing, filling, capping, labelling, packing

What does a water line have to get right before speed matters?

Raw water, neck finish and the filler-capper match decide more about a water line than its BPH. Most of the meeting goes on BPH; the other two get a fraction of the time. Change the thread by a millimetre and the rinser clamp and capping head have to change with it.

How do you turn daily demand into a BPH figure?

Work backwards from cases per day. Divide bottles per day by productive hours, then divide again by a production factor of 0.65-0.85. The factor covers changeover, CIP, label roll changes and downstream stops. Sizing at 1.0 is the most common and most expensive mistake in a water project, because the shortfall only appears once the line is running.

Filling principleBest forWatch out for
GravityStill water, one rigid bottle sizeThin-wall bottles deform under head pressure
Volumetric valve3-15 L and mixed formatsValve wear shows as slow drift, not a sudden error
IsobaricCarbonated water onlyNeeds counter-pressure, so slower per valve
Load cellOil and high-value liquidSlower cycle, higher cost per valve

Sizing for this duty runs through the Blow-fill-cap Combibloc for Still Water, where the valve count is set out.

What changes when the bottle format changes?

Star wheels, guide rails, grippers, cap chute and filling recipe all change with the format. The parts are not the cost; the time is. Two formats on one line typically cost 40-90 minutes per switch, which is why the production factor falls from about 0.85 to 0.70 and why a second small line is sometimes cheaper than one flexible line.

Site requirements, air and water consumption sit with the Gravity Filling Machine for Still Water.

What is the difference between a monoblock and three separate machines?

A monoblock carries the rinser, the filler and the capper on one frame with one drive. It removes two transfers, the floor space between them and the bottle handling at each. Three separate machines are easier to replace one at a time and easier to run at different rates.

The same question is worked through from another angle in Water Filling Machines for Glass Bottles: Special Considerations.

How to read the numbers. Rated capacity in this note follows the product specification range, not a factory acceptance test. Changeover between bottle formats, CIP and downstream stops sit outside a rated BPH, so plan on 0.65-0.85.

Frequently asked questions

Can one water line run 500 ml and 1.5 L bottles?

Yes, with change parts: star wheels, guide rails, grippers and a filling recipe. Budget 40-90 minutes per switch and expect the production factor to drop from about 0.85 to 0.70.

Is gravity or volumetric filling more accurate?

Gravity holds a fill level, so accuracy depends on bottle geometry. A volumetric filler measures a chamber volume, which keeps it accurate when the format changes. For one rigid bottle size, gravity is enough; for 3-10 L or mixed formats, volumetric is safer.

How much floor space does a water line need?

It depends on whether blowing, packing and palletizing sit in the same hall. Fix the footprint by drawing the layout at 1:100 with conveyor radii included, then check the turning radius of the largest format.

What is the acceptable fill level tolerance for water?

Commercial practice is a stated band per bottle size, typically checked by weight at the filler outlet. The band belongs in the acceptance protocol. A line without a written tolerance will argue about it at commissioning.

Key takeaways
  1. Capacity is the rating of the slowest station, not the filler nameplate.
  2. Size with a production factor of 0.65-0.85, never 1.0.
  3. It is the bottle format, not the BPH target, that picks the filling system.
  4. A 5 L line and a 500 ml line are separate specifications; treating them as one flexible option is where budgets slip.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.