| Typical duty | Still water, RO water, mineral water |
| Filling method | Gravity or volumetric valve |
| Capacity | 5,000-48,000 BPH at 500 ml |
| Bottle range | 200 ml to 16 L, by configuration |
| Material | SUS 304 product contact, CIP-ready |
| Line scope | Treatment, blowing, filling, capping, labelling, packing |
A water line stands or falls on three inputs: raw water analysis, neck finish, and how well filler and capper are matched. Most of the meeting goes on BPH; the other two get a fraction of the time. Change the thread by a millimetre and the rinser clamp and capping head have to change with it.
See how a 24,000 BPH bottled water line is configured across bottle formats and packing options.
Work backwards from cases per day. Divide bottles per day by productive hours, then divide again by a production factor of 0.65-0.85. The factor covers changeover, CIP, label roll changes and downstream stops. Sizing at 1.0 is the most common and most expensive mistake in a water project, because the shortfall only appears once the line is running.
Real capacity typically lands 15 to 35 percent below rated speed, which is why a production factor has to appear in the calculation.
| Filling principle | Best for | Watch out for |
|---|---|---|
| Gravity | Still water, one rigid bottle size | Thin-wall bottles deform under head pressure |
| Volumetric valve | 3-15 L and mixed formats | Valve wear shows as slow drift, not a sudden error |
| Isobaric | Carbonated water only | Needs counter-pressure, so slower per valve |
| Load cell | Oil and high-value liquid | Slower cycle, higher cost per valve |
Site requirements, air and water consumption sit with the Blow-fill-cap Combibloc for Still Water.
Ask for the rated capacity of the slowest station, the changeover checklist, the CIP cycle time, and the water and power consumption per 1,000 bottles. Those four numbers decide the real cost per bottle. A quotation that lists only the filler capacity and a total price leaves the buyer comparing incomparable offers.
Four places, in descending order of damage: counting an eight-hour shift as 480 productive minutes, using a production factor of 0.9 or higher, ignoring the changeover cost of a multi-SKU plan, and sizing the filler without checking the packer.
Rated output, change parts and services are listed on the Gravity Filling Machine for Still Water page.
A lighter bottle is less rigid, so it deforms more under the filling head and grips differently in the star wheels. The filler may need a different neck handling and a lower contact pressure. Lightweighting is a bottle project that reaches into the filling line.
First bottles × format litres: 24,000 BPH in 0.5 L is 12,000 litres per hour.
The same question is worked through from another angle in How to Choose Between Gravity, Pressure, and Volumetric Filling.
A monoblock carries the rinser, the filler and the capper on one frame with one drive. It removes two transfers, the floor space between them and the bottle handling at each. Three separate machines are easier to replace one at a time and easier to run at different rates.
Keeping them separate is what lets you see that a line running 60 percent 500 ml and 40 percent 1.5 L has a different mass flow from one running the reverse, at identical BPH.
Yes, with change parts: star wheels, guide rails, grippers and a filling recipe. Budget 40-90 minutes per switch and expect the production factor to drop from about 0.85 to 0.70.
Gravity holds a fill level, so accuracy depends on bottle geometry. Because volumetric filling doses by chamber volume, accuracy holds across bottle sizes. For one rigid bottle size, gravity is enough; for 3-10 L or mixed formats, volumetric is safer.
It depends on whether blowing, packing and palletizing sit in the same hall. Fix the footprint by drawing the layout at 1:100 with conveyor radii included, then check the turning radius of the largest format.
Plan for 380 V three-phase power, 0.6-0.8 MPa compressed air, and a chiller if blow molding runs in-house. Exact consumption belongs in the utility schedule of the quotation, not in a rule of thumb.
For a complete line with blowing, filling, labelling and packing, plan several weeks on site after arrival, plus operator training. Civil work and utility readiness are the usual delay, not the machinery.
Country: Maldives
Product: PET Bottled Mineralized Water
Capacity: 24,000BPH (500ml); 2 Lines
Solution:Water Production Line
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)