The capping head is built for one closure family. A screw cap, a crown and a ROPP cap need different heads, different heights and different checks. Changing closure after the line is ordered means a new head, and sometimes a new bottle finish, not a setting change.
Valve count follows the target BPH and the fill time per valve. Longer fill time, thicker product or a taller bottle all reduce the rate per valve, so the same BPH needs more valves. Buying valves for a water duty and running juice on them is a common and expensive mismatch.
| Principle | Doses by | Fails when |
|---|---|---|
| Gravity | Fill level in the bottle | Bottle geometry varies |
| Volumetric | Chamber volume | Valve seal wears |
| Isobaric | Volume under counter-pressure | Pressure or temperature drifts |
| Piston | Displacement | Product carries solids |
| Load cell | Net weight | Product temperature moves |
Site requirements, air and water consumption sit with the Gravity Filling Machine for Still Water.
The parts cost is small; the time is not. A format change touches star wheels, guide rails, grippers, the cap chute and the recipe. On a line with two formats and two changes a day, the annual hours lost exceed the price of a second small machine in many plants.
Site requirements, air and water consumption sit with the Volumetric Filling Machine for Still Water.
The neck finish sets the rinser clamp, the filling valve seal and the capping head. A change of a millimetre in the thread is a change of change parts and often of the capper. It is the single most under-specified item in a filling line enquiry.
The same question is worked through from another angle in How Semi-Automatic Fillers Help Small Beverage Factories.
A single frame carrying the rinser, the filler and the capper, driven and controlled together. It removes two transfers and the floor space between three separate machines.
From tens of minutes to over an hour, set by the circuit volume and the soil. It is a fixed cost per production day and should be planned as downtime, not squeezed into the shift.
Bottle capacity variation, product temperature, valve wear or foam. On glass, mould-to-mould capacity variation alone is enough to make level filling inconsistent, which is why glass lines often check-weigh.
Rated BPH is a steady-state figure at one format. Real output subtracts changeover, CIP, label changes and downstream stops, which is why planning uses a factor of 0.65-0.85.
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)