Two quotations that look different usually differ in four numbers: the slowest station, the changeover time, the CIP time and the consumable cost. Explore Sunwell's advanced load cell-enabled volumetric fillers to revolutionize your production efficiency and ensure precise fills for every 5L bottle.
Key facts at a glance
What is includedFilling, capping, labelling and packing equipment
Sizing basisDemand in units per day, divided by productive hours and a production factor
Production factor0.65-0.85 depending on formats and changeovers
Key controlFill accuracy, closure integrity, changeover time
Key decisionOne flexible line or two dedicated lines
AcceptanceOutput, accuracy, closure and changeover, measured

What is the first question to settle before choosing equipment?

Settle the product and the package before the machine. Product viscosity, acidity, carbonation and particle size decide the filling principle; the bottle neck finish decides the capping head and the change parts. A machine chosen before those two are fixed is chosen twice.

How do you compare two quotations that look different?

Compare the lowest rated station, the changeover time, the CIP time and the consumable cost per 1,000 units. A lower price with a slower packer or a longer CIP is not a lower cost. Ask both suppliers for the same four numbers in writing.

DecisionWhat it fixesWhat it does not fix
Filling principleProduct and accuracyDownstream capacity
Valve countRated BPHChangeover and CIP time
Automation levelLabour per shiftProduct quality
Line layoutFloor space and flowThroughput of the slowest station

For the same duty in another bottle format, the Gravity Filling Machine for Still Water is specified separately.

Where does a filling line lose output that the specification ignores?

Changeover, CIP, label roll changes and downstream stops. A line rated at 12,000 BPH and run with four formats and two changeovers per shift delivers closer to 8,000. The production factor is not a discount on the machine; it is what the plant actually gets.

Explore Sunwell's advanced load cell-enabled volumetric fillers to revolutionize your production efficiency and ensure precise fills for every 5L bottle.

A different bottle format means a different unit; see the Volumetric Filling Machine for Still Water.

When should a plant buy two lines instead of one flexible line?

When the formats are far apart, or when one product cannot tolerate the cleaning regime of the other. A single flexible line carries changeover cost every day; two dedicated lines carry capital cost once. The crossover is usually visible in the annual changeover hours.

The same question is worked through from another angle in Delivering a Line Through War and Pandemic.

What is the difference between capacity and throughput?

Capacity is what the machine can do at steady state in one format. Throughput is what the plant gets across a week of changeovers, cleaning and stops. Plans built on capacity alone are the reason new lines look slow in their first month.

This dynamic approach ensures that each 5L bottle receives the accurate fill level without any wastage, thereby enhancing operational efficiency and overall productivity.

How to read the numbers. Rated capacity in this note follows the product specification range, not a factory acceptance test. A rated figure assumes one format and no cleaning stops. Plan on 0.65-0.85 to cover changeover, CIP and downstream stoppages.

Frequently asked questions

How do I calculate the BPH I actually need?

Bottles per day divided by productive hours, then divided by a production factor of 0.65-0.85. The factor covers changeover, cleaning and downstream stops. Sizing at 1.0 is the most common planning error.

Can a line be upgraded later?

Capacity is usually added by a second line or by a downstream upgrade, not by speeding up the filler. The filler, the capper and the packer are matched, so raising one alone moves the bottleneck.

What is the difference between a monoblock and a full line?

A monoblock combines rinse, fill and cap on one frame. A full line adds treatment, blowing, labelling, packing and palletizing around it. The monoblock is one station in a longer chain.

What drives the price of a filling line?

Valve count, automation level, material of construction, whether blowing is included, and the packing format. Price follows the specification, so two quotes are only comparable when the specifications match.

How do I verify a supplier before ordering?

Ask for the factory acceptance test procedure, a reference line running the same format, and the spare parts list with lead times. A supplier who cannot show a running line has not commissioned many.

Key takeaways
  1. Fix the product and the package before the machine.
  2. Compare quotations on the slowest station, changeover and CIP time.
  3. The factory test proves the specification, not the building.
  4. Ask for the FAT procedure before the price.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×