How Blow-Fill-Cap Machines Minimize Contamination

Views: 2023 Author: Howie SUN Publish Time: Update Time:
A combiblock puts blow moulding, filling and capping on one frame with one control system, so the preform goes in and the capped bottle comes out.
Project at a glance
DestinationExport project
CapacitySet by the order
Configurationcombiblock
Productcombiblock
ScopeSupply, factory test, shipping, commissioning
RecordOrder and delivery notes below

What was ordered?

Producing bottled water involves intricate steps where every stage demands a stringent adherence to sanitation practices to prevent any form of contamination. The introduction of blow-fill-cap machines revolutionized the industry by offering a comprehensive solution to minimize potential risks effectively.

What was non-standard about the project?

This integration not only optimizes efficiency but also ensures that each bottle remains untouched and unaffected by external elements throughout its journey from production to the consumer's hands.

StationFunction in the line
Blow mouldingContainer making

Where this becomes a line rather than a single machine, the Blow-fill-cap Combibloc for CSD & Sparkling Water is the starting point.

What does the delivery record show?

As a forward-thinking bottled water plant management team, it is essential to stay updated with the latest advancements in production technologies that prioritize quality and safety. Consider integrating blow-fill-cap machines into your bottling operations to elevate your production standards and ensure consistent, contamination-free bottled water for your consumers.

The Blow-fill-cap Combibloc for Still Water is the reference unit for this configuration.

Frequently asked questions

What does the order cover?

The order covers Supply, factory test, shipping, commissioning, configured with combiblock. The line was specified for combiblock.

What capacity was specified, and what should the plant plan on?

Set by the order at the format named on the order. Rated figures exclude changeover, CIP and downstream stops, so plan production on 0.65-0.85 of that number.

What was non-standard about the project?

The non-standard items are the ones recorded in the section above. Everything else follows the standard configuration for combiblock.

How is the line handed over?

Factory acceptance test before shipment, then installation and commissioning on site. Operator training is part of the handover, not an extra.

What is covered after handover?

Spare parts for the wear items, remote support, and a commissioning report that records the settings the line was left running at.

Key takeaways
  1. Export project took delivery of a line rated Set by the order, configured for combiblock.
  2. Scope ran from factory test to commissioning: Supply, factory test, shipping, commissioning.
  3. The non-standard items are listed above rather than left to the order correspondence.
About the author
Written by the Sunswell engineering team - led by Howie SUN, Founder & CEO, with 14 years in filling and blow-moulding equipment R&D and turnkey project delivery across 71+ countries.
Last reviewed: 2026-08-28 . Reviewed by Sunswell engineering team
×

Contact Us

captcha

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

×

Inquire

*Name
*Email
Company Name
Phone/Whatsap
*Message

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.