| Typical duty | Still water, RO water, mineral water |
| Valve type | Gravity or volumetric valve |
| Capacity range | 5,000-48,000 BPH at 500 ml |
| Container range | 200 ml to 16 L, by configuration |
| Wetted parts | SUS 304 product contact, CIP-ready |
| Line scope | Treatment, blowing, filling, capping, labelling, packing |
Raw water, neck finish and the filler-capper match decide more about a water line than its BPH. BPH takes the meeting; the neck finish and the capper match get the last five minutes. Rinser clamps and capping heads are cut for one neck finish; a 1 mm thread change means new change parts rather than a new machine.
As the bottled water industry surges ahead in a dynamic marketplace, the role of automation in enhancing B2B water filling production cannot be overstated.
Above 2 L the fill time per valve grows faster than the valve count, so capacity per valve falls and the conveyor has to carry more mass. Handles, cap size and bottle rigidity also change. A 5 L line is usually specified around that format rather than shared with a 500 ml line.
| Filling principle | Best for | Watch out for |
|---|---|---|
| Gravity | Still water, one rigid bottle size | Thin-wall bottles deform under head pressure |
| Volumetric valve | 3-15 L and mixed formats | Valve wear shows as slow drift, not a sudden error |
| Isobaric | Carbonated water only | Needs counter-pressure, so slower per valve |
| Load cell | Oil and high-value liquid | Slower cycle, higher cost per valve |
Rated output, change parts and services are listed on the Blow-fill-cap Combibloc for Still Water page.
A lighter bottle is less rigid, so it deforms more under the filling head and grips differently in the star wheels. The filler may need a different neck handling and a lower contact pressure. Lightweighting is a bottle project that reaches into the filling line.
The specification sheet for the Gravity Filling Machine for Still Water carries the utility figures quoted here.
A monoblock carries the rinser, the filler and the capper on one frame with one drive. It removes two transfers, the floor space between them and the bottle handling at each. Three separate machines are easier to replace one at a time and easier to run at different rates.
The same question is worked through from another angle in The Importance of Sustainability and Innovation in Bottled Water.
Yes, with change parts: star wheels, guide rails, grippers and a filling recipe. Budget 40-90 minutes per switch and expect the production factor to drop from about 0.85 to 0.70.
Plan for 380 V three-phase power, 0.6-0.8 MPa compressed air, and a chiller if blow molding runs in-house. Exact consumption belongs in the utility schedule of the quotation, not in a rule of thumb.
For a complete line with blowing, filling, labelling and packing, plan several weeks on site after arrival, plus operator training. Civil work and utility readiness are the usual delay, not the machinery.
Commercial practice is a stated band per bottle size, typically checked by weight at the filler outlet. The band belongs in the acceptance protocol. A line without a written tolerance will argue about it at commissioning.
Country: Maldives
Product: PET Bottled Mineralized Water
Capacity: 24,000BPH (500ml); 2 Lines
Solution:Water Production Line
Country:Kazakhstan
Product: PET Bottled Sparkling Water, Canned Soft Drink, Canned Tea
Capacity: 25000CPH (250ml)
Solution:Three Lines,7000BPH(1.5L), 15000CPH(330ml),15000CPH(450ml)