Cooperation with TaZa started from 2017, who bought two turnkey lines with 5,000BPH and 10,000BPH (500ml) including water treatment plant, blow molder, AF air compressor filler, conveyor, OPP labeler, shrink wrapper, case packer up to palletizer. Two lines were installed successfully in June 2018. Based on trust and Sunswell’s brilliant service, another two sets of 24,000BPH (500ml) water lines on turnkey basis with the latest combi blocks were purchased. Hopefully, two lines will be installed in July and October 2019 respectively.