Project reference · Kazakhstan
Kazakhstan Project Reference — Turnkey Beverage Lines Delivered
Kazakhstan is Sunswell's most delivered Central Asian market: a CSD combiblock line and a multi-line water, CSD and juice plant are in operation, with EAC certification and rail logistics as the established path. This page documents the projects and what they mean for your own line.
Короткий ответ: Two delivered projects define Sunswell's Kazakhstan record: a 12,000 BPH combiblock line for CSD (Vizit), and an eight-line water, CSD and juice plant running 12,000–24,000 BPH (Rauan). Both ran the full Kazakhstan path — EAC certification, rail delivery, installation and after-sales — and both are verifiable with their owners. The projects are the evidence for the process your line would follow.
🎯 Основные выводы
- Vizit: 12,000 BPH combiblock for CSD, 1 L PET, Almaty region.
- Rauan: eight bottling and canning lines, 12,000–24,000 BPH, water/CSD/juice.
- Both ran the full KZ path: EAC, rail logistics, installation and after-sales.
- The owners are contactable — verification is a call away, not a brochure.
- The projects show the turnkey scope for a Kazakhstan plant.
На этой странице
1. Vizit — CSD combiblock
The Vizit project is a blow-fill-cap combiblock for carbonated soft drinks in the Almaty region: 12,000 BPH on a 1 L PET bottle. It is a direct reference for a CSD plant in Kazakhstan — the isobaric filling, the CO2 handling, the EAC-certified import and the local installation are all in the delivered scope.
For a CSD enquiry, Vizit is the closest match: same line type, same market, same compliance path — and its specification can be adapted to your bottle and output.
2. Rauan — multi-line plant
The Rauan project is an eight-line plant in Kazakhstan: bottling and canning lines from 12,000 to 24,000 BPH covering water, CSD and juice. It is the reference for a multi-product plant — the lines share infrastructure, services and the compliance path, and the project demonstrates the turnkey scope Sunswell carries into Kazakhstan.
A multi-line plant is a different project than a single line: the hall, the utilities and the services are planned as one system, and Rauan is the evidence that scope has been delivered.
3. The Kazakhstan path
Both projects ran the same Kazakhstan path: specification on the actual bottle, EAC certification in parallel with manufacturing, rail delivery through the established corridor, installation with a technician on site, and after-sales through the spares and service channel. The path is routine because it has been run — and it is the path your line would follow.
The path is contractual, not anecdotal: certification, delivery terms and service response are written into the agreement, and the delivered projects prove the terms are executable.
4. EAC and compliance
EAC certification is the mandatory compliance step for machinery into Kazakhstan, and both projects carried it: the certificate covers the exact model and was issued before shipment. The delivered projects are the evidence that the certification process is practised — the documents, the timing and the customs clearance are known quantities, not first-time discoveries.
Ask for the EAC path used on a delivered project — model coverage, issuing body and timing. The next project follows the same path.
For a buyer, the supplier's EAC track record in Kazakhstan is part of the qualification — and it is verifiable through the delivered projects.
5. Rail logistics and delivery
Both projects delivered by rail through the established corridor from China to Kazakhstan, with the machines crated, marked and documented for customs. Transit is measured in weeks once built, and the winter planning — ship before the cold season for a hard commissioning date — is part of the schedule the delivered projects validated.
The logistics terms (delivery point, who clears customs, who bears duty) are contract items, and the delivered projects show the terms in practice — the border is a process, not a surprise.
6. Сервис и послепродажное обслуживание
After-sales for the delivered projects runs through the established channel: spare parts with a response-time commitment, remote diagnostics, and technician visits for major work. A first-year starter kit covered the high-wear positions while the reorder channel was set up. The service pattern is in operation in Kazakhstan, which is the strongest evidence it works.
Put the response-time and visit terms in your contract — the delivered projects show the terms are executable in-country, not theoretical.
7. Using the reference
Use the references three ways: match your line type and output to the closest project and ask for its specification; verify the project with its owner before you commit; and use the delivered EAC and logistics path as the template for your contract. The Разливочная машина CSD и машина для наполнения водой ranges show the line families; the references show they run in Kazakhstan.
Часто задаваемые вопросы
Which Kazakhstan projects has Sunswell delivered?
A 12,000 BPH combiblock for CSD (Vizit) and an eight-line water, CSD and juice plant from 12,000–24,000 BPH (Rauan).
Can I verify these projects?
Yes — the owners are contactable. Ask the supplier for the reference contact and verify output, service and repeatability directly.
How is EAC handled on delivered projects?
EAC certification covered the exact model and was issued before shipment — the same path your line's certification would follow.
How do the lines arrive?
By rail through the established corridor, crated and documented for customs, with delivery terms and duty responsibility in the contract.
Какой диапазон выходного сигнала обеспечивается?
12,000–24,000 BPH across the projects, with the line type matched to the product — CSD, water and juice.
What does the reference mean for my project?
It is the evidence that the Kazakhstan path — EAC, logistics, installation, service — is executable, and the template for your contract.
Об авторе
Автор статьи — команда инженеров Sunswell под руководством... Хауи САНОснователь и генеральный директор, имеющий 14-летний опыт в разработке и производстве оборудования для розлива и выдувного формования, а также в реализации проектов «под ключ» в более чем 71 стране.
Последнее обновление: 06.08.2026 · Проверка выполнена инженерной командой Sunswell
Задайте вопрос нашей инженерной команде →Ссылки на проекты
У вас есть конкретный проект на примете?
Расскажите нам о продукте, целевом показателе BPH, размерах бутылок и рынке. Мы ответим вам предварительным проектом компоновки, списком оборудования и примерными сроками выполнения заказа.
Заполните форму запроса ↑